Hilti USA:

(800) 879-8000

Shopping Cart

Your shopping cart is empty

Non-metallic pipe : Concrete floor

Below are the systems and products best suited for this application.
System no.Fire RatingProduct
Maximum 4'' PVC or CPVC (c,v) (AS=0'' to 1/2'') 3 hours
Max. 2'' ENT (c) (AS=5/16'') 3 hours
Max 10'' PVC, CPVC max 6'' FRPP or ABS(c,v)(AS=0'' to 1/2'' on pipes 6''& smaller,0'' to 1-1/4'' on pipes larger than 6 2 or 3 hours
Max 10'' PVC, CPVC max 6'' FRPP or ABS(c,v)(AS=0'' to 1/2'' on pipes 6''& smaller,0'' to 1-1/4'' on pipes larger than 6 2 or 3 hours
Max 6'' PVC, CPVC, FRPP or ABS within a steel sleeve (c, v) (AS=1/4'' to 1-1/4'') 3 hours
Max. 6'' glass pipe (c,v) (AS=1/4'') to 3-1/2'') 3 hours
Max. 3'' PVC or CPVC (c) (AS=1/2'' to 2'') 3 hours
Max. 1-1/2'' PVC or CPVC (c,v) (AS=9/16'') 2 hours
Max. 2'' PVC, or CPVC (c,v) (AS=0'' to 5/8'') 2 hours
Max. 3'' PVC (c,v) (AS=1/2'' to 1'') 3 hours
Show all results (86)12345...9

Please log in or register  

 

If you are not already registered with Hilti Online, click the 'Not registered yet?' link.

If you want to buy online, request authorization and our customer service department will set you up.

 
Auto Login

For optimal web site performance, use IE 8.0 or greater

Click 'Forgotten Password' to request a new password